Serving Altoona and Blair County Mon–Fri 6:30 AM–6:00 PM · Licensed & insured in Pennsylvania
Altoona Dumpster Rental Group logo

Roofing

Sizing a Dumpster for a Roof Tear-Off

8 min read Written for Altoona & Blair County

Roofing is where sizing goes wrong most often, and here it is almost always the same two things: a second layer, or rotten decking under it.

Loader and roll-off container working at a building site

The one number that matters: squares

Roofers measure in squares. One square is 100 square feet of roof surface. A typical house across Blair County runs somewhere between 16 and 28 squares — the older borough houses at the lower end, the post-war and township properties higher.

If you do not know your square count, your roofer does, and it is the first thing to ask.

What a square of roofing weighs

Approximate weight per square by roofing material
MaterialApprox. weight per squareNotes
Three-tab composition~200–250 lbOlder, lighter product
Architectural composition~250–400 lbThe current standard here
Wood shake~250–400 lbOccasional under later layers
Slate~800–1,500 lbGenuinely present on older houses in this region
Built-up / modified bitumen~300–600 lbFlat roofs, porches, commercial
Metal panel~50–150 lbLight but bulky; separate as scrap
Decking (per sheet)~40–60 poundsThe variable nobody plans for
Underlayment and felt~15–30 lbAdds up on a large roof

One regional note: slate is not a curiosity here. Pennsylvania has a long slate roofing tradition and older houses in the boroughs genuinely have it. If yours does, the arithmetic changes completely — slate can be five times the weight of composition, and a slate tear-off wants a 10 yard with swaps rather than anything larger.

Composition sizing table

Recommended dumpster size for composition shingle tear-offs
Roof sizeSingle layerTwo layers
Up to 15 squares15 yard20 yard
15–25 squares20 yard30 yard
25–35 squares20 yard (watch weight)30 yard + swap
35–50 squares30 yard30 yard + swap
Over 50 squares30 yard + swapMultiple containers

Add a size if the decking is coming off too, and step down to a 10 yard with swaps for slate.

The second layer problem

The most common sizing mistake on roofing work anywhere, and common here because of when this housing was built and re-roofed.

A great many houses across this area have had a second layer of composition laid directly over the original rather than a full tear-off. It was normal, permitted practice for decades. It also roughly doubles the tear-off weight.

How to check before you book:

  • Look at the rake edge from the ground. A double layer usually shows as a noticeably thicker band at the roof edge.
  • Look at the flashing and drip edge. Two layers often sit proud of them.
  • Ask your roofer to confirm at inspection. They will know within a minute of getting up there.

If it turns up on the day, call us. A swap mid-job is far cheaper than an overloaded container that cannot legally be hauled, and the crew keeps working while the truck is on its way.

Occasionally there is composition over an original wood shake, or over slate, and both are heavier still.

Ice dams and what they do underneath

The local factor, and the reason roofs here often need more than shingles replacing.

Winters against the Allegheny Front produce real ice damming at the eaves — snow melts higher up the roof where the attic is warmer, runs down, and refreezes at the cold overhang. Water then backs up under the shingles rather than running off.

What that means when the roof comes off:

  • The eaves are where the damage concentrates. Expect soft decking in the first few feet above the wall line.
  • Fascia and soffit often need work at the same time, and that is extra material in the container.
  • Repeated freeze-thaw degrades shingles and sealants faster than a milder climate would, so replacement cycles here are shorter than the shingle warranty suggests.
  • A second layer makes it worse — trapped moisture between layers has nowhere to go.
  • Elevation matters. A property up toward the ridge sees a harder winter than one on the valley floor, and it shows in the decking.

If your roof has had ice dams, assume decking replacement is likely rather than possible, and size accordingly.

Decking is the hidden variable

You do not know the condition of the decking until the shingles are off, and it is the single most common reason a roofing container runs over.

Plywood and OSB are heavy — roughly 40 to 60 pounds a sheet. A roof needing widespread decking replacement can add a ton or more that nobody budgeted for, on top of the shingles.

On older houses here there is a second possibility: plank decking rather than sheet. Dimensional boards laid across the rafters were standard before plywood, and they are considerably heavier again per square foot.

Two responses, both fine:

  • Size up one when you book if the roof is old, has had ice dams, or carries a second layer.
  • Accept you may need a swap and factor it in.

What does not work is overfilling. A container loaded above the rail cannot legally be hauled, and the truck will leave without it — which costs a day as well as a return trip.

Storm and insurance work

A meaningful share of roofing work here is storm-driven rather than planned — wind, hail and the aftermath of a hard freeze.

  • Photograph everything before anything moves. The adjuster will want it, and once the shingles are in a container they are gone.
  • Do not dispose of damaged material until the claim is settled unless your adjuster has confirmed you can.
  • Book early after a major event. Every roofer and every hauler in the county is busy the same fortnight and containers get scarce.
  • Separate fencing and gutters from the roofing if the same storm took those down — metal has its own route and its own value.

Placement, canopy and the nail problem

Roofing containers need to sit close to the house, and around here there are three recurring constraints.

Grade. A roofing container needs to be close to the building, and on a sloped property the closest spot is not always the most workable one. Tell us the approach — it matters more here than most places.

Overhead branches. Twenty-two feet of clear height to raise the bed, and on a job with a mid-course swap that has to work twice.

Driveway width. In the older borough streets a 15 yard with a swap is often the workable shape where a 20 simply will not place.

Everywhere: boards go under the rails as standard, and a tear-off sheds an enormous quantity of nails. A magnet sweep of the drive and the street at the end is twenty minutes well spent, and it is the single most common complaint homeowners have about roofing work.

Need a container in Altoona?

Call and describe the job. Three minutes on the phone gets you a size recommendation, a flat rate and a delivery window — and we will tell you if a smaller, cheaper container is the right answer.

Call (582) 558-8207

Answers

Questions on this topic

What size dumpster for a typical roof here?
Most houses across Blair County run 16 to 28 squares, so a 20 yard for single-layer architectural composition. Watch the weight at the top of that range, and step up to a 30 if there is a second layer or the decking is coming off.
What if my roof is slate?
Then the arithmetic changes completely. Slate can be five times the weight of composition and it is genuinely present on older houses in this region. A slate tear-off wants a 10 yard with swaps rather than anything larger - weight binds long before the box looks full.
How do I know if I have two layers?
Look at the rake edge from the ground - a double layer usually shows as a noticeably thicker band, and often sits proud of the flashing and drip edge. Your roofer will confirm within a minute. It roughly doubles the tear-off weight.
Why does decking matter so much?
Because you cannot see it until the shingles are off, and plywood runs 40 to 60 pounds a sheet. On older houses here you may find plank decking instead, which is heavier again. If the roof has had ice dams, assume soft decking at the eaves rather than hoping.

Ready when you are

Need a dumpster in Altoona today?

Call and talk to a real dispatcher in Altoona — not a national call centre. Flat-rate pricing, same-day drop-off on most orders, and drivers who know every neighborhood from the SLU campus to Hollidaysburg.

Call (582) 558-8207 Mon–Fri 6:30am–6pm · Sat 7am–3pm
Call for a same-day dumpster(582) 558-8207